據(jù)能源信息統(tǒng)計(jì)3月15日消息,英國(guó)最大能源公司Drax正考慮在英國(guó)出售四個(gè)開(kāi)式循環(huán)燃?xì)廨啓C(jī)(OCGT)項(xiàng)目。該公司已經(jīng)在英國(guó)電力拍賣中獲得了為期15年的后備電力協(xié)議,總價(jià)值達(dá)2.3億英鎊(合2.7億歐元),用于在英格蘭和威爾士的三個(gè)新299 兆瓦 OCGT項(xiàng)目。每個(gè)項(xiàng)目的開(kāi)發(fā)成本約為8000至9000萬(wàn)英鎊(合9300萬(wàn)至1.05億歐元),建設(shè)時(shí)間約2年。
Drax計(jì)劃到2030年成為一家“負(fù)碳排放”公司,計(jì)劃將重點(diǎn)放在生物質(zhì)領(lǐng)域,其戰(zhàn)略目標(biāo)是擴(kuò)大產(chǎn)能和降低成本。2021年2月,Drax放棄了在英國(guó)北約克郡塞爾比開(kāi)發(fā)3600兆瓦Drax CCGT電廠項(xiàng)目的計(jì)劃。
裘寅 編譯自 enerdata
原文如下:
Drax plans to sell four gas-fired projects in the UK
Drax is considering selling four open-cycle gas turbine (OCGT) projects in the United Kingdom. The company has secured 15-year backup power agreements worth a total £230m (€270m) in a UK power capacity auction for three new 299 MW OCGT projects at sites in England and Wales. Development costs are estimated at £80-90m (€93-105m) each with a construction time of around 2 years.
Drax, which intends to become a “carbon negative” company by 2030, plans to focus on biomass, with a strategy targeting capacity expansion and cost reduction. In February 2021, Drax scrapped plans to develop the 3,600 MW Drax CCGT power plant project in Selby, North Yorkshire (UK). ?
標(biāo)簽:燃?xì)廨啓C(jī)
相關(guān)資訊